BRIDGE OF FIRSTS
3rd.jpg
The 3rd Bridge, which is going to be built on the Bosphorus, Istanbul within the Northern Marmara Motorway Project executed by IC Ictas – Astaldi Consortium, is considered the future of transportation and commerce.
00.jpg
The 3rd bridge, which is going to be built on the Bosphorus, Istanbul after the Bogazici Bridge, which started operating in 1972, and the Fatih Sultan Mehmet Bridge, which was completed in 1988, is regarded as the bridge of firsts.


THE 3rd BOSPHORUS BRIDGE
wlxJzl3.jpg
8 lanes of motorway and 2 lanes of railway will be located at the same level on the 3rd Bosphorus Bridge, which will be a product of professional engineering and advanced technology built by a team, most of whom are Turkish engineers. It will be among the most important bridges of the world with its aesthetic and technical features.
3rd_BOS_01-thumb-600x159-1588.jpg 3rd_BOS_02-thumb-600x138-1590.jpg
The bridge of firsts , the 3rd Bosphorus Bridge is going to be the widest suspension bridge in the world with a width of 59 meters and the longest spanning one that has a rail system on it, with a main span of 1408 meters. Another first of the bridge is that it is the suspension bridge with the highest tower of the world, with a height of more than 322 meters.

The 3rd Bosphorus Bridge: Symbol of Modern Turkey
33.jpg
With its construction commencing in 2013 and aimed to be completed in 2016, the 3rd Bosphorus Bridge is going to be located in the Odayeri – Paşaköy section of the Northern Marmara Motorway project. The rail system on the bridge is going to transport passengers from Edirne to Izmit. The rail system is going to be integrated with the Marmaray and the Istanbul Subway to link Atatürk Airport, Sabiha Gökçen Airport, and the 3rd Airport which will be constructed.

The Northern Marmara Motorway and the 3rd Bosphorus Bridge is going to be executed with “Build- Operate – Transfer” model. With an investment value of 4.5 billion TL, the project’s operation, including construction, is going to be executed by IC İçtas – Astaldi Consortium for a period of 10 years 2 months and 20 days and then be transferred to the Ministry of Transportation at the end of this period.

The Northern Marmara Motorway and the 3rd Bosphorus Bridge Project will be one of the symbols of modern Turkey and will bring Turkey closer to its objective of being one of the biggest 10 economies of the world in 2023.

About the 3rd Bosphorus Bridge Concept Design
melk-landscape-architecture-urban-design-Third-Bosphorus_003.jpg melk-landscape-architecture-urban-design-Third-Bosphorus_004.jpg
The concept design of the 3rd bridge, which is going to be built on the Bosphorus, İstanbul within the Northern Marmara Motorway Project, has been made jointly by structural engineer Michel Virlogeux, regarded as the “French bridge master”, and Swiss Company, T-Engineering.

Some of the bridges bearing Virlogeux’s signature as one of the most experienced names in the world for bridge design are: Vasco de Gama Bridge, one of the longest bridges of Europe with a length of 17.2 kilometres, located on Tejo River in Lisbon, capital of Portugal, and Normandy Bridge, located on the Seine River in France, which held the title of the longest suspension bridge in the world for 4 years after 1st January 1995, when it was built.

NORTHERN MARMARA MOTORWAY

Northern Marmara Motorway of nearly 115 km length, which has 19 junctions and linking roads, is located in Odayeri – Paşaköy part of the project.

This motorway project is one that covers the 3rd Bosphorus Bridge which was put out to tender on 20.04.2012 with Build – Operate – Transfer model and is planned to be finished in 2016 to relieve the traffic load of Odayeri – Paşaköy lane, and the 1st Bosphorus Bridge and the 2nd Bosphorus Bridge, which are still in use, and to resolve the transportation problem of Istanbul.


WITH THIS BIG PROJECT,

» Odayeri – İkitelli and Paşaköy – Çamlik linking roads will link the motorway with the inner city of Istanbul and relieve the busy traffic on TEM Motorway

» Vehicle will be able to transit pass and Istanbul traffic in the inner city and on current Bosphorus bridges will decrease, which will ensure considerable fuel save.

» Abolishment of transportation restrictions of load carrying vehicles will reduce the time cost in our importation and exportation.

» The 3rd Bosphorus Bridge and the Northern Marmara Motorway Project will be one of the symbols of modern Turkey and bring Turkey closer to its objective of being one of the biggest 10 economies of the world in 2023.

» The 3rd Bosphorus and the Northern Marmara Motorway’s is going to be conducted by IC İçtaş – Astaldi Consortium for a period of 10 years 2 months 20 days and then transferred to Ministry of Transportation at the end of this period.
精彩评论倒序浏览

7260查看4评论

wangweilov... 发表于 2016-3-8 19:44:25
斜拉悬吊体系建成了,主跨1408m??可惜网上没有该桥的论文或资料啊!很好的桥梁,大跨度桥梁的未来以及以后跨海桥梁的方案啊!!!
举报 回复
jinzhulaod... 发表于 2016-3-11 10:00:41
斜拉悬吊体系,希望有更详细的资料,谢谢分享。
举报 回复
jinzhulaod... 发表于 2016-3-11 10:06:27
原来国内早就有相关研究了
“斜拉—悬吊协作体系的设计探索作者肖汝诚,贾丽君,薛二乐,罗喜恒,戴利民 出版《土木工程学报》, 2000, 33(5):46-51”
举报 回复
您需要登录后才可以回帖 登录 | 注册

本版积分规则

 
 
  • QQ:56984982
  • 点击这里给我发消息
    电话:13527553862
    站务咨询群桥头堡站务咨询桥梁专业交流群:
    中国桥梁专业领袖群
    工作时间
    8:00-18:00