法国米约高架桥的图片和资料!(多塔斜拉桥)

daysee 发表于 2007-4-17 12:46:33 | 显示全部楼层 | 阅读模式
法国米约高架桥的施工图片和成桥图片

[ 本帖最后由 daysee 于 2007-4-17 13:17 编辑 ]

法国米约高架桥.rar

483.3 KB, 下载次数: 46

售价: 2 元堡币  [记录]

法国米约高架桥的施工图片幻灯.part1.rar

1.39 MB, 下载次数: 27

售价: 2 元堡币  [记录]

法国米约高架桥的施工图片幻灯.part2.rar

633.62 KB, 下载次数: 12

售价: 1 元堡币  [记录]

法国米约高架桥-7塔斜拉桥的设计与施工.rar

173.8 KB, 下载次数: 23

售价: 2 元堡币  [记录]

相关论文

精彩评论倒序浏览

3985查看9评论

daysee 发表于 2007-4-17 13:20:04

THE MILLAU BRIDGE

The Millau Bridge is in southern France and crosses the River Tarn in the Massif Central mountains. It was designed by the British architect Lord Foster and at 300m (984 feet) it is the highest road bridge in the world, weighing 36,000 tonnes. The central pillar is higher than the famous French icon, the Eiffel Tower. The Bridge opened in December 2004 and is possibly one of the most breath taking bridges ever built.

The bridge towers above the Tarn Valley and the aim of Lord Foster was to design a bridge with the ‘delicacy of a butter fly’. Lord Foster designed a bridge that enhances the natural beauty of the valley, with the environment dominating the scene rather than the bridge. The bridge appears to float on the clouds despite the fact that it has seven pillars and a roadway of 1½ miles in length. On first sight, the impression is of boats sailing on a sea of mist. The roadway threads through the seven pillars like thread through the eye of a needle.

The bridge was opened by President Jacques Chirac. In his speech he praised the design saying that it was a ‘monument to French engineering genius’ and ‘a miracle of equilibrium’.
The bridge was entirely privately financed and cost 394 million euros (272 million pounds, 524 million dollars). The aim is to cut the travelling time to southern France, removing the bottle neck at Millau, through the completion of the motorway between Paris and the Mediterranean.

CONSTRUCTION TECHNOLOGY

The bridge took only three years to complete with new engineering techniques being employed. The traditional method of building a cable stay bridge involves building sections of the deck (roadway) and using cranes to put them in position. Because of its height, 900 feet above the valley floor, a new technique had to be developed.

   
First, the towers were built in the usual way, with steel reinforced concrete.
The road way was built on either side of the valley and rolled into position, until it met with precision in the centre. This technique had never been tried before and it carried engineering risks. However, it proved to be an efficient method of deploying the roadway.
举报 回复
76584711 发表于 2007-4-17 15:43:33
:L :L :L 钱太少了,买不起啊!~
举报 回复
jgalaxy 发表于 2007-5-29 23:17:31
嗚~~~  我也是錢太少了!!  沒辦法買!
举报 回复
日光陶醉... 发表于 2007-5-30 16:50:16
付了币怎么还不能下载阿?
举报 回复
日光陶醉... 发表于 2007-5-30 17:03:09
终于能下载了,要好好看看
举报 回复
oicyep 发表于 2007-8-17 18:26:17

我要看看    啊均可  的范甘迪说
举报 回复
fengxingli... 发表于 2007-11-2 09:08:09
干吗要收钱啊!我们新手没多少钱啊!
举报 回复
fengxingli... 发表于 2007-11-3 15:48:37
收了好多钱啊!心疼呢,不过希望物有所值。
举报 回复
feng2004jo... 发表于 2013-6-13 16:31:57
我想知道这个桥的钢塔和主梁是怎么连接的,谁能告诉我下,谢谢!楼主,你这些东西网上有的是,收费就不地道了。
举报 回复
您需要登录后才可以回帖 登录 | 注册

本版积分规则

 
 
  • QQ:56984982
  • 点击这里给我发消息
    电话:13527553862
    站务咨询群桥头堡站务咨询桥梁专业交流群:
    中国桥梁专业领袖群
    工作时间
    8:00-18:00